Development of a Simplified Mathematical Modelling for the Job Shop Scheduling to Calculate Makespan

M.S. Kagthara, M.G. Bhatt

Abstract


In this paper, mathematical modelling is prepared for job shop scheduling problem. Makespan is calculated using maximum machine time. Matlab algorithm is developed for mathematical modelling. Formula is tested using various case studies. Gantt chart is prepared for graphical representation of solution. Results have been verified for mathematical modelling using Gantt chart approach.

Cite this Article
Kagthara MS, Bhatt MG. Development of a Simplified Mathematical Modelling for the Job Shop Scheduling to Calculate Makespan. Journal of Production Research and Management. 2017; 7(1): 22–25p.


Keywords


Job-Shop Scheduling, Mathematical modeling, Gantt chart, Makspan

Full Text:

PDF

References


Keesari HS, Rao RV. Optimization of job shop scheduling problems using teaching-learning-based optimization algorithm. Opsearch. 2014; 51(4): 545–561p.

Guo ZX, et al. Mathematical model and genetic optimization for the job shop scheduling problem in a mixed-and multi-product assembly environment: a case study based on the apparel industry. Comput Ind Eng. 2006; 50(3): 202–219p.

Šeda Miloš. Mathematical models of flow shop and job shop scheduling problems. World Acad Sci Eng Technol. 2007; 1(31): 122–127p.

Moghaddas R, Houshm M. Job-shop scheduling problem with sequence dependent setup times. Proceedings of the International Multi Conference of Engineers and Computer Scientists, 2008.

Mahavi Mazdeh, Mohammad Farzad Zaerpour, Farzad Firouzi Jahantigh. A fuzzy modeling for single machine scheduling problem with deteriorating jobs. Int J Ind Eng Comput. 2010; 1(2): 147–156p.

Shapiro JF. Mathematical programming models and methods for production planning and scheduling, in: S.C. Graves, et al. (Eds.), Handbooks in OR and MS, vol. 4, Elsevier Science Publishers B.V., 1993, 371–443p.

Pan, Chao-Hsien. A study of integer Mathematical Modelling for the Job Shop Scheduling programming formulations for scheduling problems. Int J Syst Sci. 1997; 28(1): 33–41p.

Blazewicz, Jacek, Moshe Dror, Jan Weglarz. Mathematical programming formulations for machine scheduling: a survey. Eur J Oper Res. 1991; 51(3): 283–300p.

Bowman EH. The scheduling-sequence problem. Oper Res. 1959; 7(5): 621–4p.

Dantzig GB. A machine-job scheduling model. Manage Sci. 1959; 6: 191–6p.




DOI: https://doi.org/10.37591/joprm.v7i1.3723

Refbacks

  • There are currently no refbacks.