Empirical Evaluation of Performance ofConstruction Management at-Risk (CM at-Risk) Project Delivery System With and Without Agency-CM
Abstract
A project delivery system is a comprehensive process of assigning the contractual responsibilities for designing and constructing a project. Design-Bid-Build (D-B-B), Design-Build (D-B), and Construction Management at risk (CM-at-Risk) are the three principal project delivery systems. Agency CM is as a construction management system, and is a way to manage the process of construction.Agency-CM doesn’t take any performance risk in guaranteeing project cost, project schedule and project quality. Generally Agency CM is remunerated on monthly fee, lump sum fee or by the percentage of the project cost that has conflict of interest with the final project schedule and final project cost. Considerable amount of fee is paid to the Agency CM in order to improve the efficiency of the project. This necessitates a comprehensive investigation in to the performance of projects delivered with Agency CM and projects delivered without Agency CM.Agency-CM can be used with any type of Project Delivery system. This study is intended to evaluate the project performance metrics such as Project Cost, Project Schedule and Project Quality in Projects where CM –at - RiskProject Delivery System was used with Agency CM and Projects and where CM-at-Risk Project Delivery System was used without Agency CM.The study included literature review, designing a questionnaire, collecting data from 200 CM-at-Risk projects of which 100 projects where Agency CM was used and 100 projects where Agency CM was not used. Analysis of data pertaining to project performance metrics was done by using Statistical Product and Service Solutions (SPSS) statistical software. An understanding of this study may help an owner/client better select the most suitable Project Delivery System between the CM-at-Risk Project Delivery System with Agency CM and CM-at-Risk Project Delivery system without Agency CM.
Keywords:Agency construction management, project delivery systems, CM-at-riskwith agency CM,project performance metrics, CM-at-risk without agency CM, construction projects
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |