A Study of Factor Affecting of Delayness of Cost Overrun in Building Construction

Authors

  • Kapil Soni
  • Rohit Yadav

DOI:

https://doi.org/10.3759/jocetm.v8i2.978

Abstract

Abstract

In this paper, a study has been summarized about the factor that cause of delay in construction housing project in the Gwalior division and produce the statistical result. The result of the investigation will be the guideline to the parties that involve, so that it will avoid any reason of the delay that will happen in their project.

Keywords: development, building, construction

Published

2018-07-25

Issue

Section

case study