Environment, Health and Safety Management by Risk Assessment of Activities in Construction Project Site
Abstract
The constructing development enterprise is developing all over the world. The construction activities and work is a strong part of the wealth in India. it gives opportunities for employment for a wide range of people in the country. The aims of this study are to find out the regular practice of health and safety risk calculations, risk communication and risk management; and the environment health and safety management planning for the construction project work. The objective of case study plan was adopted whereby a construction site was selected through appropriate sample collection. It can be utilized to analyse and observe the safety risk level of every possible hazardous event that is identified during the construction. The sample could also be applied in other construction projects to obtain results with greater accuracy and reliability from the evaluation and ranking of safety risks, which would yield data that would be useful in helping the management team to mitigate and control the risks in other construction sites.
Keywords
Full Text:
PDFReferences
Akintoye AS, Macleod MJ. Risk analysis and management in construction. Int J Proj Manag.
; 15(1): 31–38.
Uher TE, Toakely AR. Risk management in conceptual phase of a project. Int J Proj Manag.
; 17(3): 161–169.
Bing L, Tiong RLK. Risk management model for international construction joint ventures. J
Constr Eng Manag. 1999; 125(4)p.
Hastak M, Shaked A. ICRAM-1 Model for international construction risk management. J Manag
Eng. 2000 Jan; 16(1): 59–69.
Wang SQ, Dulami MF. Risk management frame work for construction projects in developing
countries. Constr Manag Econ. 2004; 22(3): 237–252.
Rwamamara AR. Planning the Healthy Construction Workplace through Risk Assessment and
Design Methods. Doctoral thesis. Lulea University of Technology. Department of Civil, Mining
and Environmental Engineering. Luleå: Luleå tekniska universitet; 2007.
Charles M, Pillay J, Ryan R. Guide to Best Practice for Safer Construction: Literature review
'From concept to completion. Australia: Cooperative Research Centre for Construction
Innovation, for Icon.Net Pty Ltd.; 2007.
Lingard H, Rowlinson SM. Occupational Health and Safety in construction project management.
UK: Taylor & Francis; 2005.
Haimes YY. Risk Modeling, Assessment, and Management. 3rd Edn. Canada: John Wiley and
Sons; 2009.
Andersson R. Injury Causation, Injury Prevention and Safety Promotion–Definitions and Related
Analytical Frameworks. In: Laflamme L, Svanström L, Schelp L, editors. Safety Promotion
Research. Stockholm: Karolinska Institutet; 1999; 15–42.
Bohrmann B. A Socio-Psychological Model for Analyzing Risk Communication Process. The
Austras J Disaster Trauma Stud. 2000.
Akintoye, MacLeod. Risk analysis and management in construction. Int J Proj Manag. 1997;
(1): 31–38. ISSN 0263-7863.
Bing L, Tiong RL. Risk management model for international construction joint ventures. J Constr
Eng Manag. 1999; 125(5): 377–384.
Daniel, Andrew. Modelling global risk factors affecting construction cost performance. Int J Proj
Manag. 2003; 21(4): 261–269. ISSN 0263-7863.
Osipova E. Risk management in construction projects: a comparative study of the different
procurement options in Sweden. Thesis. Lulea: Licentiate dissertation; 2008.
Hastak M, Shaked A. ICRAM-1: Model for international construction risk assessment. J Manag
Eng. 2000; 16(1): 59–69.
Jayasudha K, Vidivelli B. A Study on Risk Assessment in Construction Projects. International
Journal of Modern Engineering Research (IJMER). 2014; 4(9): 20–23.
Purohit Devdatt P, Siddiqui NA, Abhishek Nandan, Yadav Bikarama P. Hazard Identification and
Risk Assessment in Construction Industry. Int J Appl Eng Res. 2018; 13(10): 7639–7667. ISSN
-4562.
Emmanuel Eze, Onyinye Sofolahan, Lawrence Siunoje. Health and safety management on
construction projects: the view of construction trades people. J Infrastruct Dev. 2020; 3(2): 152–
Goran Cirovic, Simo Sudjic. Risk assessment in construction industry. Belgrade, Serbia: The
College of Civil Engineering and Geodesy; 158–164.
Sachin Chauhan, Nihal Anwar Siddiqui. Hazards identification & risk assessment in construction
industry. Int J Creat Res Thoughts (IJCRT). 2018 Mar; 6(1): 722–727.
Thabit Thabit H, Younus Saif Q. Risk Assessment and Management in Construction Industries.
Int J Res Eng. 2018 Feb; 5(2): 315–320. ISSN: 2348-7860 (O).
Shapoorji Pallonji Construction Company Data: URL:
https://www.shapoorjipallonji.com/pdfs/SP_E_And_C_achieves_50_Million_safe_manhours.pdf
Ehsan N, Mirza E, Alam M, Ishaque A. Notice of Retraction: Risk management in construction
industry. In 2010 3rd IEEE International Conference on Computer Science and Information
Technology. 2010 Jul; 9: 16–21.
Hinze J, Pedersen C, Fredley J. Identifying root causes of construction injuries. J Constr Eng
Manag. 1998; 124(1): 67–71.
Hughes PW, Ferrett E. Introduction to health and safety in construction. Oxford: Elsevier
Butterworth-Heinemann; 2005.
Roozbeh Kangari, Riggs Leland S. Construction Risk Assessment by Linguistics. IEEE Trans
Eng Manag. 1989; 36(2): 2–8.
He Zhi. Risk management for overseas construction projects. Int J Proj Manag. 1995; 13(4): 231–
Chapman Robert J. The controlling influences on effective risk identification and assessment for
construction design management. Int J Proj Manag. 2001; 19(3): 147–160.
Shou Qing Wang, Mohammed Fadhil Dulaimi, Muhammad Yousuf Aguria. Risk management
framework for construction projects in developing countries. Constr Manag Econ. 2004; 22(3):
–252.
Edmundas Kazimieras Zavadskas, Zenonas Turskis, Jolanta Tamošaitiene. Risk assessment of
construction projects. J Civ Eng Manag. 2010; 16(1): 33–46.
Mohan A, Saravana Karthika V, Ajith J, Lenin Dhal, Tholkapiyan M. Investigation on ultra-high
strength slurry infiltrated multiscale fibre reinforced concrete. Mater Today: Proc. 2020; 22: 904–
ISSN: 1904-4720.
Saravana Karthika V, Mohan A, Dinesh Kumar R, Chippymol James. Sustainable Consideration
by Characterization of Concrete through Partial Replacement of Fine Aggregate Using Granite
Powder and Iron Powder. J Green Eng. 2019 Dec; 9(4): 514–525. ISSN: 1904-4720 (Print) 2245-
(Online).
Jothilakshmi M, Chandrakanthamma L, Dhaya Chandhran KS, Mohan A. Flood control and water
management at basin level at Orathur of Kanchipuram district. Int J Eng Adv Technol. 2019 Sep;
(6S3): 1418–1421. ISSN: 2249-8958.
Gopalakrishnan R, Sounthararajan VM, Mohan A, Tholkapiyan M. The strength and durability of
flyash and quarry dust light weight foam concrete. Mater Today: Proc. 2020; 22: 1117–1124.
ISSN: 1904-4720.
Dhaya Chandhran KS, Jothilakshmi M, Chandhrkanthamma L, Mohan A. Thermal Insulation and
R-Value Analysis for wall Insulated with PCM. International Journal of Innovative Technology
and Exploring Engineering (IJITEE). 2019 Oct; 8(12S): 11–16. ISSN: 2278-3075.
Srividhya K, Mohan A, Tholkapiyan M, Arunraj A. Earth Quake Mitigation (EQDM) Through
Engineering Design. Mater Today: Proc. 2020; 22: 1074–1077. ISSN: 1904-4720.
Dhayachandhran KS, Jothilakshmi M, Tholkapiyan M, Mohan A. Performance Evaluation and RValue for Thermally Insulated Wall with Embedding Fluted Sheets. Mater Today: Proc. 2020; 22:
–919. ISSN: 1904-4720.
Md Rasli A, Wan Maseri Wan Mohd. Project performance framework: The role of knowledge
management and information technology infrastructure. Asian J Bus Account. 2008; 1(2): 39–64.
The Victorian Government. (2009). Supplementary Guidance Project Risk Management
Guideline. Version 1.0.
Tillmann Sachs SM, Tiong Robert LK. Quantifying Qualitative Information on Risks
Development of the QQIR Method. J Constr Eng Manag. 2009; 135(1): 56–71.
Uher TE, Toakely AR. Risk management in conceptual phase of a project. Int J Proj Manag.
; 17(3): 161–169.
Wang SQ, Dulami MF. Risk management frame work for construction projects in developing
countries. Constr Manag Econ. 2000.
Roozbeh Kangari, Riggs Leland S. Construction Risk Assessment by Linguistics. IEEE Trans
Eng Manag. 1989; 36(2): 2–8.s
He Zhi. Risk management for overseas construction projects. Int J Proj Manag. 1995; 13(4): 231–
Chapman Robert J. The controlling influences on effective risk identification and assessment for
construction design management. Int J Proj Manag. 2001; 19(3): 147–160.
Shou Qing Wang, Mohammed Fadhil Dulaimi, Muhammad Yousuf Aguria. Risk management
framework for construction projects in developing countries. Constr Manag Econ. 2004; 22(3):
–252.
Edmundas Kazimieras Zawada’s, Zenonas Turskis, Jolanta Tamosaitiene. Risk assessment of
construction projects. J Civ Eng Manag. 2010; 16(1): 33–46.
Mohan A, Saravana Karthika V, Ajith J, Lenin Dhal, Tholkapiyan M. Investigation on ultra-high
strength slurry infiltrated multiscale fibre reinforced concrete. Mater Today: Proc. 2020; 22: 904–
ISSN: 1904-4720.
Saravana Karthika V, Mohan A, Dinesh Kumar R, Chippymol James. Sustainable Consideration
by Characterization of Concrete through Partial Replacement of Fine Aggregate Using Granite
Powder and Iron Powder. J Green Eng. 2019 Dec; 9(4): 514–525. ISSN: 1904-4720 (Print) 2245-
(Online).
Refbacks
- There are currently no refbacks.