A Study on Time Optimization of Recoat Calender in Tyre Manufacturing Process

Authors

  • Ramdas J. Department of Mechanical Engineering, Mar Baselios Institute of Technology and Science (MBITS) Nellimattom, Ernakulam, Kerala, India

DOI:

https://doi.org/10.37591/joaea.v2i2.4556

Keywords:

Recoat calendar, compound slitter, bead apex

Abstract

Seven components are produced by the recoat calender in this plant. The machine cannot satisfy the current requirements of the company. Utilization planning of the 36 inch recoat calender. Optimize the production time and introduce a compound slitter.

Published

2020-12-04

Issue

Section

Articles