Open Access
Subscription or Fee Access
A Study on Time Optimization of Recoat Calender in Tyre Manufacturing Process
Abstract
Seven components are produced by the recoat calender in this plant. The machine cannot satisfy the current requirements of the company. Utilization planning of the 36 inch recoat calender. Optimize the production time and introduce a compound slitter.
Keywords
Recoat calendar, compound slitter, bead apex
Full Text:
PDFDOI: https://doi.org/10.37591/joaea.v2i2.4556
Refbacks
- There are currently no refbacks.