Determination of the Priority in Risks Management of Construction Projects
Abstract
Construction projects are faced to a state of uncertainty and an increase in the likelihood of multiple risk types, since that the achievement of these projects goes through several stages. The first is the decision stage and other stages ending with the maintenance phase of these projects, which leads to increase in the length of the period of completion, and privacy enjoyed by construction projects and distinguishes them apart from the rest of the projects. This uncertainty appears in the uncertainty of control to achieve the objectives of the projects, which are, the time of completion, the cost and quality of work, in addition to the safety of these projects professionally. This uncertainty can be overcome through analysing risk to these projects and then managing them and studying the results. Several studies have been made in this field, including this study. The aim of this research is to study the different types of risk and its impact on a variety of construction projects and then determine the most important risk in order to confront it by identifying its maximum and minimum index of importance; and so correctly using the project budget and not wasting it in facing of other risks with less importance; as well as study the most important procedures of response to these risks. The achievement of these aims was through the views of a number of experts in the construction industry in the field of risk management through questionnaire (exclusively) for the purpose of reaching a certain strategy in how to manage them correctly. One of the main conclusions reached by the research is that the two risks: lack of plans for the networks service passers through the site electrical such as a chart, telephone, water, etc. and differences between the required implementation specifications as a result of a misunderstanding of the drawings and specifications have the most important influence on construction projects, and put contractual conditions is the most appropriate procedure in response and confrontation risks.
Keywords: Construction industry, analysis and risk management, uncertainty, risk index
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |