Time Overrun Causes in Public Construction Projects in Saudi Arabia: Contractors’ View
Abstract
The time schedule in construction projects is one of the prime measures for project success. However, the construction industry worldwide is full of projects that were completed with significant time overrun. This problem is critical and has negative effects on construction parties in terms of growth in adversarial relationships, mistrust, litigation, arbitration and cash flow problems. This study aims at identifying the time overrun causes in public construction projects in Saudi Arabia from contractors’ viewpoint. To do so, 62 contractors from Northern Province of Saudi Arabia who are working on public construction completed a structured questionnaire survey. 35 time overrun causes were identified through literature review. The results indicated that the top affecting causes are: additional work, bid award for lowest price, changes in material types and specifications during construction, contract management, fluctuation of prices of materials, improper planning, inflationary pressure, lack of contractor experience, poor labor productivity, and rework.
Keywords: time overrun, delay, public construction, risk map, causes
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |