Dispute Preventive Measures in Construction
DOI:
https://doi.org/10.37591/jocetm.v13i2.7412Abstract
Dispute is one of the critical factors causing inefficient construction industry due to which cost and time overrun occurs. Various causes of disputes whether client related or contractor related, are inherently lies in contract documents. A contract document comprises of mainly two section of documents, one, contractual terms and conditions related documents (General conditions of contract, Special conditions of contract) and second one is the technical documents (specifications, BOQ, etc.). Special conditions of contract are the most critical area of contract where dispute arises. The aim of this research paper is to identify the critical dispute factors, their criticality and analyzing these factors to identify the preventive measures of the disputes. Using expert interview, various domains of contract has been identified, where improvement is required to prevent construction disputes.References
Amoah, C., & Nkosazana, H. (2022). Effective management strategies for construction contract
disputes. International Journal of Building Pathology and Adaptation Emerald Publishing
Limited.
ARCADIS. (2022). Successfully navigating through turbulent times. Netherlands: Acridis.
Associates, N. D. (2020, April). Nishith Desai Associates, Legal and Tax Counseling Worldwide.
Retrievedfromnishithdesai:
https://www.nishithdesai.com/fileadmin/user_upload/pdfs/Research_Papers/Construct iondisputes-in-india.pdf
Cakmak, E., & Cakmak, P. I. (2014). An analysis of causes of disputes in the construction
industry using analytical network process. Procedia - Social and Behavioral Sciences, 183-187.
CIDC. (2023, 1 28). Construction Industry Developing Council. Retrieved from cidc.in:
http://www.cidc.in/theme3.html
CPWD. (2023, 1 28). Government of India Ministry of Housing & Urban Affairs Central Public
Works Department. Retrieved from cpwd.gov.in: https://cpwd.gov.in/AllCirculars.aspx?Type=26
Hadiya, R. (2010, December). Contract Management Strategy to Avoid Dispute In Construction.
New Delhi, New Delhi, India: School of Planning and Architecture.
Irene, M. M. (2023, 02 04). Retrieved from shodhganga.inflibnet.ac.in:
https://shodhganga.inflibnet.ac.in/bitstream/10603/28837/9/09_chapter%202.pdf
Iyer, K. C., & Satyanarayana, K. N. (2000). Final and binding power clauses in Indian
construction contracts. International Journal of Project Management, 13-22.
Khekale, C., & Futane, N. (2013). Management of Claims and Disputes in Construction Industry.
International Journal of Science and Research (IJSR), 848-856.
limited, d. e. (2015). Construction Market in India. Mumbai: dmg events India.
Loganathan, S., Srinath, P., Kumaraswamy, M., Kalidindi, S., & Varghese, K. (2017). Identifying
and Addressing Critical Issues in the Indian Construction Industry: Perspectives of Large
Building Construction Clients. Journal of Construction in Developing Countries, 121-144.
Moza, A., & Paul, V. K. (2018). Analysis of claims in public works construction contracts in.
Journal of Construction in Developing Countries, 7-26.
Naji, K. K., Mansour, M. M., & Gunduz, M. (2020). Methods for Construction Disputes
Modeling and Evaluation: A Critical Review. IEEE Accsess, 45641-45652.
Nihas, S., Barlish, K. C., & Kashiwagi, D. T. (2013). CONSTRUCTION INDUSTRY
STRUCTURE IN INDIA.
Noushad, M., Thomas, A. V., & P., R. K. (2021). Evaluation of Dispute Prone Areas in
Construction Projects. “Proceedings of International Web Conference in Civil Engineering for a.
Kollam, Kerala, India: AIJR Publisher.
Patel, S., & Patel, A. (2017). Dispute Resolution in Construction Industry. Journal of Emerging
Technologies and Innovative Research (JETI), 374-378.
S, A., & RK, D. (2018). A Review of Causes and Effects of Dispute in the Construction Projects
of Nepal. Journal of Steel Structure & Construction.
Sawhney, A., Agnihotri, R., & Paul, V. K. (2014). Grand challenges for the Indian Construction
Industry. Built Environment Project and Asset Management, 314-334.
Sharma, R. A. (1997). Hand Book Of Arbitration In Construction Contracts. Delhi: O. P. Chadha,
for Om Law Book House.
Shash, A. A., I, S., & Habash. (2021). Disputes in Construction Industry: Owners and
Contractors’ Views on Causes and Remedies. Journal of Engineering, Project, and Production
Management, 37-51.
Soni, S., Pandey, M., & Agrawal, S. (2017). Conflicts and Disputes in Construction Projects: An
Overview. International Journal of Engineering Research and Application, 40-42.
Stephenson, D. A. (2001). Arbitration Practice in Construction Contracts. Blackwell Science Ltd.
team, 5. r. (2023, 1 28). Construction Sector: Building up a new Indian economy | 5Paisa.
Retrieved from 5paisa.com: https://www.5paisa.com/blog/construction-sector- building-up-anew-indian-economy
Viswanathan, S. K., Panwar, A., Santu, K., Raag, L., & Jha, K. N. (2020). Causal Modeling of
Disputes in Construction Projects. J. Leg. Aff. Dispute Resolut. Eng. Constr.
Watts, V. M., & Scrivener, J. C. (2007). Review of Australian building disputes settled by
litigation. Building Research & Information, 59-63.
X.N, M., C, A., & D, T. (2016). Investigation of construction stakeholders’ perception on the
effects & cost of construction dispute in Swaziland. Precedia Engineering,, 196- 205.
Yiu, S. O. (2006). Are Construction Disputes Inevitable? Ieee Transactions on Engineering
Management, 456-470.
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |