Development of Overall Process Effectiveness for Continuous Flow Line in a Semiautomated Manufacturing System
Abstract
Keywords
Full Text:
PDFReferences
Mathur A, et al. Meas Bus Excellence. 2011;15(1):77–91p.
Neely A, et al. Int J Oper Prod Manage. 1995; 15(4):80–116p.
MacKerron G, et al. Int J Manuf Technol Manage. 2006; 8(4):401–16p.
Badiger AS, et al. Eur J Ind Eng. 2008; 2(3):356–76p.
Kumar J, et al. Int J Prod Perform Manage. 2014; 63(1):44–56p.
Jose AG-R, et al. Int J Qual Reliab Manage. 2010; 27(1):48–62p.
Yuniawan D, et al. Concurrent Eng. 2013; 21(4):296–306p.
Farhad A, Rodger E. Int J Prod Perform Manage. 2011; 60(5):512–28p.
Panagiotis H. Int J Prod Res. 2013; 51(2):515–23p.
Soniya P, et al. Int J Res Mech Eng Technol. 2012; 3(2):25–9p.
Kwon O, Lee H. J Qual Maint Eng. 2004; 10(4):263–72p.
Ljungberg Õ. Int J Oper Prod Manage. 1998; 18(5):495–507p.
Jeong KY, Phillips DT. Int J Oper Prod Manage. 2001; 21(11):1404–16p.
Muthiah KMN, Samuel HH. Int J Ind Syst Eng. 2006; 1(4):461–84p.
Nachiappan RM, Anantharaman N. J Manuf Technol Manage. 2006; 17(7):987–1008p.
Marcello B, et al. J Manuf Technol Manage. 2009; 20(1):8–29p.
Parida A, Kumar U. J Qual Maint Eng. 2006; 12(3):239–51p.
Ahuja IPS, Khamba JS. Int J Qual Reliab Manage. 2008; 25(7):709–56 p.
Anvari F, et al. J Qual Maint Eng. 2010;
DOI: https://doi.org/10.37591/joprm.v4i2.7158
Refbacks
- There are currently no refbacks.