Open Access Open Access  Restricted Access Subscription or Fee Access

Environment, Health and Safety Management by Risk Assessment of Activities in Construction Project Site

Pravin Tathod, Prabhanshu Jain

Abstract


The constructing development enterprise is developing all over the world. The construction activities and work is a strong part of the wealth in India. it gives opportunities for employment for a wide range of people in the country. The aims of this study are to find out the regular practice of health and safety risk calculations, risk communication and risk management; and the environment health and safety management planning for the construction project work. The objective of case study plan was adopted whereby a construction site was selected through appropriate sample collection. It can be utilized to analyse and observe the safety risk level of every possible hazardous event that is identified during the construction. The sample could also be applied in other construction projects to obtain results with greater accuracy and reliability from the evaluation and ranking of safety risks, which would yield data that would be useful in helping the management team to mitigate and control the risks in other construction sites.


Keywords


Health and safety risk, Risk Management, Risk Communication, Risk control, Construction Sites, Practice, and Process

Full Text:

PDF

References


Akintoye AS, Macleod MJ. Risk analysis and management in construction. Int J Proj Manag.

; 15(1): 31–38.

Uher TE, Toakely AR. Risk management in conceptual phase of a project. Int J Proj Manag.

; 17(3): 161–169.

Bing L, Tiong RLK. Risk management model for international construction joint ventures. J

Constr Eng Manag. 1999; 125(4)p.

Hastak M, Shaked A. ICRAM-1 Model for international construction risk management. J Manag

Eng. 2000 Jan; 16(1): 59–69.

Wang SQ, Dulami MF. Risk management frame work for construction projects in developing

countries. Constr Manag Econ. 2004; 22(3): 237–252.

Rwamamara AR. Planning the Healthy Construction Workplace through Risk Assessment and

Design Methods. Doctoral thesis. Lulea University of Technology. Department of Civil, Mining

and Environmental Engineering. Luleå: Luleå tekniska universitet; 2007.

Charles M, Pillay J, Ryan R. Guide to Best Practice for Safer Construction: Literature review

'From concept to completion. Australia: Cooperative Research Centre for Construction

Innovation, for Icon.Net Pty Ltd.; 2007.

Lingard H, Rowlinson SM. Occupational Health and Safety in construction project management.

UK: Taylor & Francis; 2005.

Haimes YY. Risk Modeling, Assessment, and Management. 3rd Edn. Canada: John Wiley and

Sons; 2009.

Andersson R. Injury Causation, Injury Prevention and Safety Promotion–Definitions and Related

Analytical Frameworks. In: Laflamme L, Svanström L, Schelp L, editors. Safety Promotion

Research. Stockholm: Karolinska Institutet; 1999; 15–42.

Bohrmann B. A Socio-Psychological Model for Analyzing Risk Communication Process. The

Austras J Disaster Trauma Stud. 2000.

Akintoye, MacLeod. Risk analysis and management in construction. Int J Proj Manag. 1997;

(1): 31–38. ISSN 0263-7863.

Bing L, Tiong RL. Risk management model for international construction joint ventures. J Constr

Eng Manag. 1999; 125(5): 377–384.

Daniel, Andrew. Modelling global risk factors affecting construction cost performance. Int J Proj

Manag. 2003; 21(4): 261–269. ISSN 0263-7863.

Osipova E. Risk management in construction projects: a comparative study of the different

procurement options in Sweden. Thesis. Lulea: Licentiate dissertation; 2008.

Hastak M, Shaked A. ICRAM-1: Model for international construction risk assessment. J Manag

Eng. 2000; 16(1): 59–69.

Jayasudha K, Vidivelli B. A Study on Risk Assessment in Construction Projects. International

Journal of Modern Engineering Research (IJMER). 2014; 4(9): 20–23.

Purohit Devdatt P, Siddiqui NA, Abhishek Nandan, Yadav Bikarama P. Hazard Identification and

Risk Assessment in Construction Industry. Int J Appl Eng Res. 2018; 13(10): 7639–7667. ISSN

-4562.

Emmanuel Eze, Onyinye Sofolahan, Lawrence Siunoje. Health and safety management on

construction projects: the view of construction trades people. J Infrastruct Dev. 2020; 3(2): 152–

Goran Cirovic, Simo Sudjic. Risk assessment in construction industry. Belgrade, Serbia: The

College of Civil Engineering and Geodesy; 158–164.

Sachin Chauhan, Nihal Anwar Siddiqui. Hazards identification & risk assessment in construction

industry. Int J Creat Res Thoughts (IJCRT). 2018 Mar; 6(1): 722–727.

Thabit Thabit H, Younus Saif Q. Risk Assessment and Management in Construction Industries.

Int J Res Eng. 2018 Feb; 5(2): 315–320. ISSN: 2348-7860 (O).

Shapoorji Pallonji Construction Company Data: URL:

https://www.shapoorjipallonji.com/pdfs/SP_E_And_C_achieves_50_Million_safe_manhours.pdf

Ehsan N, Mirza E, Alam M, Ishaque A. Notice of Retraction: Risk management in construction

industry. In 2010 3rd IEEE International Conference on Computer Science and Information

Technology. 2010 Jul; 9: 16–21.

Hinze J, Pedersen C, Fredley J. Identifying root causes of construction injuries. J Constr Eng

Manag. 1998; 124(1): 67–71.

Hughes PW, Ferrett E. Introduction to health and safety in construction. Oxford: Elsevier

Butterworth-Heinemann; 2005.

Roozbeh Kangari, Riggs Leland S. Construction Risk Assessment by Linguistics. IEEE Trans

Eng Manag. 1989; 36(2): 2–8.

He Zhi. Risk management for overseas construction projects. Int J Proj Manag. 1995; 13(4): 231–

Chapman Robert J. The controlling influences on effective risk identification and assessment for

construction design management. Int J Proj Manag. 2001; 19(3): 147–160.

Shou Qing Wang, Mohammed Fadhil Dulaimi, Muhammad Yousuf Aguria. Risk management

framework for construction projects in developing countries. Constr Manag Econ. 2004; 22(3):

–252.

Edmundas Kazimieras Zavadskas, Zenonas Turskis, Jolanta Tamošaitiene. Risk assessment of

construction projects. J Civ Eng Manag. 2010; 16(1): 33–46.

Mohan A, Saravana Karthika V, Ajith J, Lenin Dhal, Tholkapiyan M. Investigation on ultra-high

strength slurry infiltrated multiscale fibre reinforced concrete. Mater Today: Proc. 2020; 22: 904–

ISSN: 1904-4720.

Saravana Karthika V, Mohan A, Dinesh Kumar R, Chippymol James. Sustainable Consideration

by Characterization of Concrete through Partial Replacement of Fine Aggregate Using Granite

Powder and Iron Powder. J Green Eng. 2019 Dec; 9(4): 514–525. ISSN: 1904-4720 (Print) 2245-

(Online).

Jothilakshmi M, Chandrakanthamma L, Dhaya Chandhran KS, Mohan A. Flood control and water

management at basin level at Orathur of Kanchipuram district. Int J Eng Adv Technol. 2019 Sep;

(6S3): 1418–1421. ISSN: 2249-8958.

Gopalakrishnan R, Sounthararajan VM, Mohan A, Tholkapiyan M. The strength and durability of

flyash and quarry dust light weight foam concrete. Mater Today: Proc. 2020; 22: 1117–1124.

ISSN: 1904-4720.

Dhaya Chandhran KS, Jothilakshmi M, Chandhrkanthamma L, Mohan A. Thermal Insulation and

R-Value Analysis for wall Insulated with PCM. International Journal of Innovative Technology

and Exploring Engineering (IJITEE). 2019 Oct; 8(12S): 11–16. ISSN: 2278-3075.

Srividhya K, Mohan A, Tholkapiyan M, Arunraj A. Earth Quake Mitigation (EQDM) Through

Engineering Design. Mater Today: Proc. 2020; 22: 1074–1077. ISSN: 1904-4720.

Dhayachandhran KS, Jothilakshmi M, Tholkapiyan M, Mohan A. Performance Evaluation and RValue for Thermally Insulated Wall with Embedding Fluted Sheets. Mater Today: Proc. 2020; 22:

–919. ISSN: 1904-4720.

Md Rasli A, Wan Maseri Wan Mohd. Project performance framework: The role of knowledge

management and information technology infrastructure. Asian J Bus Account. 2008; 1(2): 39–64.

The Victorian Government. (2009). Supplementary Guidance Project Risk Management

Guideline. Version 1.0.

Tillmann Sachs SM, Tiong Robert LK. Quantifying Qualitative Information on Risks

Development of the QQIR Method. J Constr Eng Manag. 2009; 135(1): 56–71.

Uher TE, Toakely AR. Risk management in conceptual phase of a project. Int J Proj Manag.

; 17(3): 161–169.

Wang SQ, Dulami MF. Risk management frame work for construction projects in developing

countries. Constr Manag Econ. 2000.

Roozbeh Kangari, Riggs Leland S. Construction Risk Assessment by Linguistics. IEEE Trans

Eng Manag. 1989; 36(2): 2–8.s

He Zhi. Risk management for overseas construction projects. Int J Proj Manag. 1995; 13(4): 231–

Chapman Robert J. The controlling influences on effective risk identification and assessment for

construction design management. Int J Proj Manag. 2001; 19(3): 147–160.

Shou Qing Wang, Mohammed Fadhil Dulaimi, Muhammad Yousuf Aguria. Risk management

framework for construction projects in developing countries. Constr Manag Econ. 2004; 22(3):

–252.

Edmundas Kazimieras Zawada’s, Zenonas Turskis, Jolanta Tamosaitiene. Risk assessment of

construction projects. J Civ Eng Manag. 2010; 16(1): 33–46.

Mohan A, Saravana Karthika V, Ajith J, Lenin Dhal, Tholkapiyan M. Investigation on ultra-high

strength slurry infiltrated multiscale fibre reinforced concrete. Mater Today: Proc. 2020; 22: 904–

ISSN: 1904-4720.

Saravana Karthika V, Mohan A, Dinesh Kumar R, Chippymol James. Sustainable Consideration

by Characterization of Concrete through Partial Replacement of Fine Aggregate Using Granite

Powder and Iron Powder. J Green Eng. 2019 Dec; 9(4): 514–525. ISSN: 1904-4720 (Print) 2245-

(Online).


Refbacks

  • There are currently no refbacks.