Delay factors in construction projects effecting cost & time
DOI:
https://doi.org/10.3759/rtcet.v8i3.1403Abstract
In construction industry one of the most common problems are cost over-run and delay. Delay can be minimized with the help of optimal scheduling techniques with the help of scheduling software’s. Delay means we are not meeting the deadline on time which results cost and time overrun. For the economic development of India construction segment is one of the sectors that provides important component. It is considered one of the recurring problems and has an adverse effect in terms of time, cost and quality. The causes and effects of delays in residential construction projects are identified in this paper. The causes of delays assessed using Relative Importance Index (RII) so as to rank the factors. Questionnaire was prepared to collect the data and circulated to Client, Contractor and Consultant. Analysis of data collected is done by SPSS Statistics V24 and results, conclusion are stated in this paper.
References
Ahmed, S.M. Azhar S. kappagntula P, Gollapudil D. “ Delays in Construction: a brief study of florida construction industry”, Journal of Construction Engineering Management, 2003, 134 (11), pp. 831-841
Assaf, AlHejji S. “Causes of delays in large construction projects”,International Journal of Project Management, 2006, 24(4), pp. 349-357,
Assaf S.A, Alkhail M, Al-Hazmi M. “ Causes of delay in large building construction project”, Journal of Management in Engineering, ASCE, 1995, 11 (2), pp. 40-45
Sambasivan M, Soon Y.W., “ Causes and effects of delays in Malaysian construction industry”, International Journal of Project Management, 2007, 25 (5), pp. 517-526
Fugar, F D K and agyakwah-Baah, A B, “Delays in building construction projects in Ghana”, Australasian Journal of Construction Economics and Building, 2010, 10(1/2), pp. 103-116
Prakash Rao, Joseph, “Causes of delays in construction projects-a case study, International Journal of Current Research, ISSN:0975-833X, 2014, 6 (6), pp. 7219-7222
Desai Megha, Dr. Bhatt, “ A methodology for ranking of causes of delay”, International Journal of Engineering Technology and Advanced Engineering, ISSN: 2250-2459, 2013, 3 (3), pp.396-404
Arditi, D and Pattanakitchamroon, T., “Selecting delay analysis method in resolving construction claims”, International Journal of Project Management, Elsevier, 2006, 21, pp. 145-155
L.Muhwezi, J. Acai, “ An assessment of the factors causing delays on building construction projects in Uganda”, International Journal of Construction Engineering and management, 2014, 3(1), pp. 13-23
Keval Shah, M.R. Apte, “Causes of delay in construction of bridge Girders”, IOSR Journal of Mechanical & Civil Engineering, ISSN: 2278-1684, 2015, 12(1), pp.8-12
Mamata Rajgor, Chauhan Paresh, “ RII & IMPI: effective techniques for finding delay in construction project, International Research Journal of Engineering and Technology, ISSN: 2395-0056, 2016, 3 (1), pp. 1173-1177
Arjun Suwal, Santosh Kumar, “Causes of delays of motorable bridge construction under postal highway projects, Departments of reads, Journal of Advanced college of Engineering and Management, 2016, vol.2
Dasaria Taruna, Dr, Bhatt, “ Ranking of factors affecting selection of subcontractor for construction contractors of Gujrat by RII”, IJARIIE, ISSN: 2395-4396, 2016, 2(3), pp. 438-446
Aedwin Regi, Shibi, “Analysis of delays in constructions projects”, International Journal of Engineering Research and General Science, ISSN: 2091-2730, 2015, 3 (6), pp. 108-112
Aditi Dinakar, “Analysis of Delays in Construction Projects”, IJETAE , Vol 4, Issue 5, May 2014.
Robert F Devilis, “ Scale Development Theory & Applications”, Applied Social Research Methods Series, Vol 26.
Downloads
Published
Issue
Section
License
Declaration and Copyright Transfer Form
(to be completed by authors)
I/ We, the undersigned author(s) of the submitted manuscript, hereby declare, that the above manuscript which is submitted for publication in the STM Journals(s), is not published already in part or whole (except in the form of abstract) in any journal or magazine for private or public circulation, and, is not under consideration of publication elsewhere.
- I/We will not withdraw the manuscript after 1 week of submission as I have read the Author Guidelines and will adhere to the guidelines.
- I/We Author(s ) have niether given nor will give this manuscript elsewhere for publishing after submitting in STM Journal(s).
- I/ We have read the original version of the manuscript and am/ are responsible for the thought contents embodied in it. The work dealt in the manuscript is my/ our own, and my/ our individual contribution to this work is significant enough to qualify for authorship.
- I/We also agree to the authorship of the article in the following order:
Author’s name
1. ________________
2. ________________
3. ________________
4. ________________
| We Author(s) tick this box and would request you to consider it as our signature as we agree to the terms of this Copyright Notice, which will apply to this submission if and when it is published by this journal. |