Open Access Open Access  Restricted Access Subscription or Fee Access

A Comprehensive Review of Scheduling and Monitoring Techniques for Arch Bridge Projects Using Primavera P6

Deepak Kumar Kushwah, Harsh Rathore

Abstract


Arch bridge construction projects require meticulous scheduling and monitoring to ensure timely completion and adherence to project specifications. The objective of this review paper is to conduct a comprehensive examination of how the management tool Primavera P6 is employed in the scheduling and monitoring of arch bridge projects. By examining the latest research, industry practices, and case studies, this paper explores the benefits, challenges, and best practices associated with employing Primavera P6 in the context of arch bridge construction. The paper begins with an introduction to arch bridge projects and their unique characteristics, emphasizing the importance of scheduling and monitoring for project success. It then introduces Primavera P6 and its role in project management, highlighting its suitability and effectiveness for arch bridge projects.

Full Text:

PDF

References


Keshav Phophalia and Riddha Basu, [Evaluation of microsoft project and primavera p6 as construction project management software in india], international journal of innovations in engineering research and technology [IJIERT] ISSN: 2394-3696 volume 5, issue 3, mar.-2018.

A.A. Lakade, A.K. Gupta and D.B. Desai, [A Project Management Approach Using Erp And Primavera In Construction Industry], IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 21-24, 2020.

Anurag Mahure and Amit kumar Ranit, [Construction Project Analysis Using Primavera P6], JASC: Journal of Applied Science and Computations, Volume 5, Issue 8, August /2018, ISSN NO: 1076-5131.

Divya V S and C Gayathri, [Flexible Scheduling in Construction Industry by Using Primavera], International Journal for Modern Trends in Science and Technology ISSN: 2455-3778, Volume: 06, Issue No: 04, April 2020.

Yash Pandit, Swaroop Kulkarni, Yash Choulwar, Soumitra Kher and S.D. Marawar, [Analysis of Planning and Scheduling Using Traditional and Primavera Approach], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 6, Issue 4, April 2017.

T. Subramani and K. Chinnadurai, [Construction Management And Scheduling Of Residential Building Using Primavera], International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 4, Issue 5, May 2015, ISSN 2319 - 4847.

V.S. Divya, [Flexible Scheduling For Construction by Using Primavera Software], ICONIC Research And Engineering Journals, NOV 2019 | IRE Journals | Volume 3 Issue 5 | ISSN: 2456-8880.

Md. Zishan Mallick and Mohd Zeeshan khan, [Construction planning and control using primavera P6], IJARIIE-ISSN(O)-2395-4396, Vol-5 Issue-4 2019.

Balakrishna Ch, Anand Goud K, Akula Prakash and Kandlagunta Mounik, [Schedule delay analysis of a multi-storied residential project using primavera], IOP Conf. Series: Materials Science and Engineering, ICIRMCT 2021.

Sudarshan. S and Geena George, [Comparison of project planning & scheduling software primavera and microsoft project used in the construction industry], International Journal of Engineering Technologies and Management Research Septmber 2021 8(9), 78-87.

Hitanshu Saini, Khushpreet Singh and Uma Malik, [Project management in construction using primavera], International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 8, August 2017, pp. 538–549, Article ID: IJCIET_08_08_055.

K.Priya, M. Kathiresan, D. Vengateshwari and M. Suriyakumari, [Planning, analysis and construction scheduling of appartment building (g+13) by using primavera P6], International Journal of Scientific Development and Research (IJSDR), March 2019 IJSDR | Volume 4, Issue 3, ISSN: 2455-2631.

Suchithra L and Anne Ligoria S, [Tracking and management of construction projects using primavera], International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 07 | July -2017.

Nidhi Raghuwanshi and M. C. Paliwal, [Planning and Scheduling Construction Projects using Primavera Software: A Case Study], International Journal of Trend in Scientific Research and Development (IJTSRD) Volume 5 Issue 2, January-February 2021.

Fathima Zerin T and Angela C. Joy, [Construction Management Using Primavera], International Journal of Science and Research (IJSR) ISSN: 2319-7064, 2018.

Kottamasu L. N. Panakala Rao and K. Shyam Chamberlin, [Resources Optimization in Construction of a Residential Apartment by using Primavera: a Case Study], International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019.

Selva Kumar M and Manishankar S, [Delay Analysis of Highway Construction Using Primavera], Emperor Journal of Applied Scientific Research, 2020, Vol. 2 Issue, -05.

Shubhashree P. Deshmukh and A. B. Ranit, [Comparative Study of Scheduling in PRIMAVERA and M. S. Project], International Journal for Scientific Research & Development| Vol. 7, Issue 03, 2019.

Nagaraj Belsur, Brijbhushan S and Maneeth P D, [Scheduling, Monitoring And Cost Analysis By Earned Value Method Of Phase-2 (Reach-2a From Pier No.443 To Pier No.470) Using Primavera P6], International Journal of Engineering Development and Research, 2017 IJEDR | Volume 5, Issue 3 | ISSN: 2321-9939.

Gunjal Kartikeyan, Rohit Gholap, Ranjeet Katkar, Prasad Khune and Pooja Bhosale, [To study advanced project planning and scheduling-case study], international journal of advance scientific research & engineering trends, || Volume 5 || Issue 12 || April 2021 || ISSN (Online) 2456-0774.

Deepti Sahu and A. K Jain “Resource Planning of a Colony Project Using Primavera”, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 6, Issue 1, January 2017.

Akash Rajkumar Wadhwa and Dattatray Shantaram Shinde, “Project Management Using Primavera P6 8.2”, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 3, Issue 11, Nov-2016.

Shaik Mohammad Masood, Devanand. R and Harsha H. N, “An analysis on Resource Planning, Cost Estimation and Tracking of Project by Earned Value Management”, International journal of Innovative Research in Science, Engineering and Technology, Vol. 4, Issue 4, October-2014.

T. Subramani, A Sarkunam and J. Jayalaxmi, “Planning and Scheduling of High Rise Building Using Primavera”, Journal of Engineering and Research Applications, Vol.4, Issue 6, pp.134-144, June 2014.

Abbas M Abd and Suhad M Abd, “Resources Sustainability Planning Model Using Hierarchical Approach for Construction Project”, Diyala Journal of Engineering Sciences, Vol. 05, No. 02, pp. 1-19, Dec-2012.

T.SivaNagaraju And Sri Lakshmana Kumar, [Schedule And Resources Optimization Using Primavera In Metro Rail Project], International Journal of Mechanical And Production Engineering, ISSN: 2320-2092, Volume- 4, Issue-7, Jul.-2016.

Mohammad Afzal S. Siddiqui and Abhijit N. Bhirud, [EPS, OBS, Project Activities for Pune Metro Phase-1 in Primavera P6], Journal of Advances and Scholarly Researches in Allied Education, Vol. XV, Issue No. 2, (Special Issue) April-2018, ISSN 2230-7540.

R.Santhosh Kumar and Anoop James Antony, [Experimental Investigation on Preplanning of Road Construction by Using Primavera], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 7, Issue 5, May 2018.

Abdul Aziz and Sanjeet Kumar, [Financial and Work Management Analysis for Residential Construction: a Case Study], International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019.

Akash Rajkumar Wadhwa And Dattatray Santram Shinde, [Project Management Using Primavera P68.2], International Journal Of Innovations In Engineering Research And Technology [Ijiert], Issn: 2394-3696, Volume 3, Issue 11, Nov.-2016.

AjeshPilaniya and Ashwin A. Mahajan, [A Review of Planning & Scheduling of a Pune Metro Rail Project using Primavera P6 Web], IJSRD - International Journal for Scientific Research & Development| Vol. 6, Issue 09, 2018 | ISSN: 2321-0613.

Alberto Cerezo-Narváez, Andrés Pastor-Fernández, Manuel Otero-Mateo and Pablo Ballesteros-Pérez, [Integration of Cost and Work Breakdown Structures in the Management of Construction Projects], Appl. Sci. 2020, 10, 1386; doi:10.3390/app10041386.

Kottamasu L. N. Panakala Rao and K. Shyam Chamberlin, [Resources Optimization in Construction of a Residential Apartment by using Primavera: a Case Study], International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277- 3878, Volume-7, Issue-6C2, April 2019. 57

Chiranjeevi D S, Dr. G. Narayana and Rajeeva S J, [Analysis On Cost, Schedule And Tracking Of Residential Project By Earn Value Management Method Using Primavera P6], August 2017 | IJIRT | Volume 4 Issue 3 | ISSN: 2349-6002.

Akshay R. Kohli, [Enterprise Project Management using Primavera P6 EPPM], International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 12 | Dec-2017, Impact Factor value: 6.171.

Samad M. E. Sepasgozar, Reyhaneh Karimi, Sara Shirowzhan, Mohammad Mojtahedi, SabbarEbrahimzadeh and David McCarthy, [Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK], Buildings 2019, 9, 191; doi:10.3390/ buildings9090191.

Piyush Pramod Bagde and Abhijit N. Bhirud, [Project Management by Using Primavera P6 Software], Journal of Advances and Scholarly Researches in Allied Education, Vol. XV, Issue No. 2, (Special Issue) April-2018, ISSN 2230-7540.

Anurag Mahure and Amitkumar Ranit, [Planning, Scheduling and Tracking of building Using Primavera P6], International Journal of Engineering Science Invention (IJESI), Volume 7 Issue 8 Ver III || Aug 2018 || PP 60-64.

Anurag Mahure and Amitkumar Ranit, [Project Management using Primavera P6], International Journal of Engineering Research & Technology (IJERT), ISSN: 2278- 0181, Vol. 7 Issue 04, April-2018.

Arindam Debnath, M. Srinivas, Raghavendra Rao and Kalaswamy Naik, [Project Monitoring and Controlling, Reach -2b, Phase-2 BMRCL], International Journal for Scientific Research & Development| Vol. 5, Issue 08, 2017 | ISSN: 2321-0613


Refbacks

  • There are currently no refbacks.