Decision–making Model for Road Projects Retendering in Nigeria

Wilson Udo Udofia

Abstract


The failure in securing basic information about project can rock mega investment in road construction. Most road construction projects suffered due to reasons attributed to delays or terminations which prompt project owners to consider retendering option. Effective and efficient decision-making is prerequisite in the retendering of projects and is perceived lacking in most road projects. In order to overcome these challenges confronting road construction project, this paper aims to build a valid and viable decision–making model for road projects retendering in Nigeria. This paper suggested that the decision-making indicators include project definition, generation, assessment, and the motoring/evaluation could influence the retendering of road projects. This position may be of significant value to the researchers, the project clients, contractors and project team involve in contract management as it showcased the relevant of project definition, generation, assessment, and motoring/evaluations as decision-making indicators in the retendering of road construction projects.


Full Text:

PDF

References


Elonen S, Artto K A. Problems in managing internal development projects in multi-project environments, International Journal of Project Management. 2003; 21(6): 395–402p.

Caniels MCJ, Bakens RJJM. The effects of Project Management Information Systems on decision making In a multi project environment, International Journal of Project Management. 2012; 30(2): 162–175p.

Jia G, Yang F, Wang G, et al. Study of mega project from a perspective of social conflict theory, International Journal of Project Management. 2011; (26): 817–827p.

Toor SR., Ogunlana SO. Successful project leadership: understanding the personality traits and organizational factors, Proceedings of CIB-W107, International Symposium, Construction in Developing Economies: New Issues and Challenges, Santiago, Chile. 2006.

Watson P, Seng LT. Implementing the European Foundation for Quality Management Model in construction, Construction Information Quarterly, Construction paper 130.

Bassioni HA, Price ADF, Hassan TM. Building a conceptual framework for measuring business performance in construction: an empirical evaluation, Construction Management and Economics. 2005; 5(23): 495–507p.

Muazu DA, Bustani SA. A Comparative Analysis of Litigations among Foreign and Indigenous Construction Firms in Nigeria, ATBU Journal of Environmental Technology. 2004; 1(3):13–16p.

Freeman HM. A Review of the Performance of Botswana Citizen Building Contractors. Port Elizabeth-South Africa: MSc Thesis, NMMU. 2011

Nicholas C. Babajide GB. An Evaluation of Risk Events Impacting Highway and Road Construction Projects in Nigeria. The 8th International Conference on Construction and Real Estates Management (ICCREM 2010) ‘Leading Sustainable Development through Construction and Real Estates Management’, At Brisbane, Australia. 2014.

Idoro GI. The Influence of Project Documents on the Outcome of Construction Projects Procured by Traditional Contracts in Nigeria, Journal of Construction in Developing Countries. 2012a; 1(17): 1–19p.

Idoro GI. Influence of Project Plans on the Outcome of Construction Projects Procured by Design-Build in Nigeria, Journal of Construction in Developing Countries. 2012b; 2(17): 77–99p.

Patanakul P, Milosevic D. A competency model for effectiveness in managing multiple projects, The Journal of High Technology Management Research. 2008b; 2(18): 118–131p.

Zika-Viktorsson A, Sundström P, M Engwall, A. Project overload: an exploratory study of work and management in multi-project settings, International Journal of Project Management. 2006; 5(24): 385–394p.

Tucker K J. Strategic planning principles. Integrated marketing communications: Strategic planning perspectives Toronto: Pearson Education Canada. 2007; (2): 47–51p.

Hafner AW. Pareto's Principle: The 80-20 Rule Dean of University Libraries Ball State University Muncie, IN 47306, http://www.bsu.edu/library/ .2001.

Chou JS, Yang IT, Chong WK. Probabilistic simulation for developing likelihood distribution of engineering project cost. Automation in Construction. 2009; 18: 570–577p.

Quinlan JR. Induction of decision trees, Machine Learning. 1986; 1: 81–10p.

World Bank. Annual Report. http://web.worldbank.org. Accessed 23 April 2013.

Construction Industry Institute. Costs of quality deviations in design and construction. RS 10-1 (Jan.). The Univ. of Texas at Austin, Austin, Tex.1989.

Construction Management Association of America. Cost management procedures, archimedesnet.com/CMAA-mega/CMAA-12-10-2013/CMAA Cost. 2011.

Limi A, Benamghar R. Optimizing the Size of Public Road Contracts. World Bank Policy Research Working Paper No. 6028. Available at SSRN: http://ssrn.com/abstract=2035784. 2012.

Love P ED, Mandal P, Li H. Determining the causal structure of rework in construction projects. Construction Management Economics. 1999; 4(17): 505–517p.

Justis R T, Kreigsmann B. The feasibility study as a tool for venture analysis, Business Journal of Small Business Management. 1979; 1(17): 35–42P.

Georgakellos D A, Marcis AM. Application of the semantic learning approach in the feasibility studies preparation training process, Information Systems Management. 2009; 3(26): 231–240p.

Young G I M. Feasibility studies. Appraisal Journal. 1970; 3(38): 376–383p.

Farr F, Ford C. Individual innovation, in West, M.A. and Farr, J.L. (Eds), Innovation and Creativity at Work: Psychological and Organisational Strategies, Wiley, Chichester.1990.

Hussey D E. Creativity, innovation and strategy, in Hussey, D.E. (Ed.), The Innovation Challenge, John Wiley & Sons, Chichester, 1997; 1–15p.

Tidd J, Blessant J, Pavitt K. Managing Innovation: Integrating Technological, Market and Organizational Change. Wiley, Chichester. 1997.

Ashworth A, Hogg K, Willis’s. Practice and Procedure for Quantity Surveyor, Blackwell Publishing Ltd, Oxford, UK. 2007.

Aghion P, Dewatripont M, Rey P. Renegotiation design with unverifiable information, Econometrica. 1994: 257–282p.

Guasch JL, Laffont JJ, Straub S. Concessions of Infrastructure in Latin America: Government-led Renegotiation. http://www.econ.ed.ac.uk/papers/gov_led_reneg_april05.pdf. 2003.

Ballard M J, Warner M E. Taking the High Road: Local Government Restructuring and the Quest for Quality. Power Tools for Fighting Privatization, American Federation of State, County and Municipal Employees: Washington DC. 2000; 1(6): 6/53p.

Fricke S E, Shenhar AJ. Managing multiple engineering projects in a manufacturing support environment, IEEE Transactions on Engineering Management. 2000; 2(47): 258–268p.

Bowen P, Akintoye A, Pearl R, et al. Ethical behaviour in the South African Construction Industry, Journal of Construction Management and Economics. 2007; 25: 631 – 648p.

Ahmad I, Minkarah I A. Optimum markup for bidding: a preference-uncertainty trade off approach, Civil Engineering Systems, 1987; 4: 170–174p.

Egan J. Rethinking Construction. Report of the Task Force Department of the Environment, Transport and the Region, London.1998.

O’Conner JT, Tucker RL. Industrial project constructability improvement”, Journal of Construction Engineering Management. 1986; (1121): 69–82p. Mansfield E. How rapidly does new industrial technology leak out, Journal of Industrial Economics. 1985; 34(2): 217–23p.

Mansfield E. How rapidly does new industrial technology leak out, Journal of Industrial Economics. 1985; 34(2): 217–23p.

Hampson K, Bradon P. Construction 2020. A vision of Australia’s property and construction industry, RCR Construction Innovation, Australia. 2004.

CWIC. The building technology and construction industry technology roadmap, in A. Dawson (Ed), Collaborative Working in Consortium, Melbourne. 2004.

NIST. Cost analysis of interoperability in the U.S capital facilities industry, in: A.C Gall. 2004.

Burati J L, Farrington J J, Ledbetter W B. Causes of quality deviations in design and construction. Journal of Constriction and Engineering Management. 1992; 1(118): 34–49p.

Eckhardt R. Stan Ulam, John von Neumann, and the Monte Carlo method, Los Alamos Science, Special Issue. 1987; 15: 131–137p.

Olatunji OA, Aje IO. Eliminating economic wastes in construction through the use of prequalification in contractor selection for construction projects. Proceedings of the International Conference on Construction and Real Estate (ICCREM 2005), Penang, Malaysia. 2005.

Piramuthu S. Input data for decision trees. Expert Systems with Applications. 2008; 34: 1220–1226p.

Van Vliet V. Albert Humphrey. Retrieved [insert date] from Tools. 2010.




DOI: https://doi.org/10.3759/ttea.v2i3.2825

Refbacks

  • There are currently no refbacks.